A white pavilion-style folding house with a floor-to-ceiling glass front wall — maximum light, modern lines.
20FT
From$7,200
A white pavilion-style folding house with a floor-to-ceiling glass front wall — maximum light, modern lines.
White folding container house with a full-height black glass front wall — a light-filled 36 m² pavilion for studios, cafes, and scenic rentals.
Transparent engineering. Request the full BOM and drawings.

Exterior, interior, and detail views






Tailored to your project and local market
Select glass type (clear, tinted, low-E, or frosted), mullion layout, white shade, interior partitions, flooring, blinds, and AC. We can add a rear service door, skylight, or LED cove lighting.

Engineered in Room 355-2, 3rd Floor, Building 2, No. 20 Wenzhi Road, Guancheng Hui District, Zhengzhou, Henan, China. Trusted across five continents.
A crane offloads the folded unit on site, then four workers unfold, bolt and seal — about 2 hours.
Folded volume is just one-third of the open home, cutting ocean freight costs by up to 70%.
High-strength galvanized steel frame. Wind-resistant to Grade 12, earthquake-resistant to Grade 8.
A1-rated rock wool sandwich panels — non-combustible, thermal and acoustic (≥30 dB reduction).
Roof and joints sealed with double waterproof adhesive and sealing strips for any climate.
Layout, finishes, windows and plug standards matched to your destination country.
Everything you need to know before ordering.
Yes — we ship worldwide by sea container. Most orders are delivered within 4–8 weeks depending on your port and destination.
Absolutely. Layout, bedroom count, finishes, windows, doors, and electrical plug standards are all matched to your local market.
Prices are FOB China for the complete steel-frame home with standard interior finish. Shipping, customs, and local installation are quoted separately.
Yes — a crane or forklift is required to offload the folded unit from the truck. Once it is set in position, four workers can unfold and assemble the main structure in about 2 hours. Final utility hookups take 1–2 hours.