"Turnkey" is one of the most used — and most misunderstood — words in the prefab industry. For a folding container home, a genuine turnkey package means the unit leaves the factory finished and tested, so that on-site work is limited to positioning, unfolding and connecting utilities. This guide explains exactly what factory-finished delivery includes for 20FT, 30FT and 40FT HG Prefab container homes, and where the factory's responsibility ends and yours begins.
What Turnkey Means for a Folding Container Home
HG Prefab uses "turnkey" to describe a unit that is built, fitted and tested at the factory before it is packed for export. The buyer receives a finished living space — not a bare steel shell with a list of trades still to hire. Typical turnkey units include insulation, finished walls and floors, doors and windows, full electrical wiring with fixtures, and a fitted bathroom and kitchen when configured.
The Standard Factory-Finished Package
Whatever the layout, a factory-finished container home from HG Prefab includes the following scope of work:
- Structure — galvanized steel frame and panels, fold-and-expand mechanism tested at the factory.
- Insulation — rock wool or foam insulation in walls, floor and roof panels; A1 fire-rated material on request.
- Doors and windows — steel security door, interior doors and double-glazed windows with screens.
- Electrical — pre-wired distribution board, internal wiring to final points, LED lighting and power sockets, with a 63A inlet ready for site connection.
- Plumbing (if configured) — water supply lines, drainage, sink and tap; bathroom package with shower, basin and toilet where ordered.
- Interior finishes — painted or laminated walls, finished flooring, ceiling lining and trim.
- Exterior finish — prime coat and topcoat paint or specified cladding colour.
- Testing — electrical continuity test, plumbing pressure test, roof water test and fold/unfold check before packing.
Fit-Out Levels: Standard, Upgraded and Furnished
Not every turnkey home needs the same interior scope. HG Prefab offers three levels:
| Level | Included | Typical Use | Approx. Extra |
|---|---|---|---|
| Standard | Insulation, finished walls/floors, electrical, basic lighting | Site office, farm housing, shell for local fit-out | Base price |
| Upgraded | Standard plus bathroom, kitchenette, quality flooring, AC pre-wiring | Residential, rental units | +$2,500–$5,000 |
| Furnished | Upgraded plus furniture, appliances, bedding and decor | Ready-to-move-in homes, Airbnb, hotels | +$6,000–$12,000 |
The exact price depends on unit size and finish grade. A furnished 40FT unit typically runs $22,000–$32,000 FOB depending on the furniture list.
Quality Control Before the Unit Leaves
Factory QC is what separates a true turnkey home from a box of problems. HG Prefab inspects every unit against a written checklist:
- Dimensional accuracy and smooth fold/unfold operation
- Welding quality and frame alignment
- Roof and window seal water tests
- Electrical continuity, insulation resistance and socket polarity
- Plumbing pressure test (where plumbing is fitted)
- Floor, wall and paint finish check
Buyers can request photos, a video walkthrough or a third-party inspection before packing. For the full checklist, see our factory QC and inspection guide.
Export Packing and Delivery
Once tested, the unit folds flat to standard ISO container dimensions and is strapped, wrapped and prepared for sea freight. Export delivery covers:
- Flat-packed loading in a 40FT HC container or on a flat rack, depending on unit size
- Commercial invoice, packing list, bill of lading and certificate of origin
- Material certificates for steel, insulation and electrical components
- A delivery schedule from order to port, including production and shipping windows
Transit time varies by destination — typically 15–35 days to most regions. See our delivery timeline guide for stage-by-stage timing.
What Still Happens on Site
Factory-finished delivery removes the building work, but a short site checklist remains:
- Site and foundation — a level pad or light foundation prepared before the unit arrives.
- Offload — the folded unit is set in position with a crane or forklift, which the buyer arranges locally.
- Assembly — four workers unfold and assemble the main structure in about two hours.
- Utility connection — power, water and sewer connection by a licensed local contractor, typically one to three days.
- Local permits — building and occupancy approvals depend on the jurisdiction; HG Prefab supplies the documents you need to apply.
Questions to Ask Before You Order
To avoid surprises, confirm these points in writing before production:
- Is the bathroom and kitchen included in the quoted price, or listed as an option?
- Which electrical voltage and plug standard will the unit be wired to?
- What documentation will be provided for customs and building permits?
- What is the lead time for a standard unit versus a customized one?
- Which Incoterm applies, and what is included up to that point?
Clarity on these five questions turns a "turnkey" promise into a project you can plan around.
Need a folding container house?
HG Prefab manufactures 20FT, 30FT and 40FT folding expandable container houses with factory-finished turnkey packages — built, tested and shipped flat-packed worldwide.
Browse modelsFrequently Asked Questions
What is included in a turnkey container home from HG Prefab?
A factory-finished package typically includes the steel structure, insulation, doors and windows, pre-wired electrical with fixtures, plumbing where configured, interior walls and flooring, a painted exterior, and a QC test before packing. Standard, upgraded and furnished levels differ mainly in fit-out scope.
What is not included in turnkey delivery?
Land, the foundation pad, crane or forklift offload, and utility hookups are arranged on site. Local permits, transport insurance and import duties are separate. HG Prefab provides the documentation and delivery schedule so you can plan these in advance.
Do I need a crane to install a turnkey container home?
Yes — a crane or forklift is required to offload the folded unit from the truck. Once it is set in position, four workers can unfold and assemble the main structure in about 2 hours.
How soon after delivery can we move in?
For a fully fitted unit, allow one to three days on site for assembly, utility connection and final checks. If the site, foundation and permits are ready before arrival, most buyers move in within the first week.
Can I order a fully furnished turnkey container home?
Yes. HG Prefab offers a furnished package that includes furniture such as beds, sofas, tables and kitchen cabinets, coordinated with the interior finish. Confirm the furniture list during ordering so everything ships inside the unit.